To have a planning basis in order for the "agenda park", in the year 2000 the class VT97 got the order to make a location and elevation recording of the northeast college grounds.
In order to have a planning basis for the reconfiguration of the schoolyard of the "Vocational College of Further Education I Stade",  the class VT01 got the order  to record the existing schoolyard topography in the year 2002. 
Therefore the students of the class were divided into four groups who conducted the recording of different parts of the schoolyard. They described their work in "group reports", which can be reached by the links. 
southern part of the lower schoolyard including the entrance stair 
northern part of the schoolyard including ramp and stairs 
in front of BBS II 
upper schoolyard
An aim of the reconfiguration of the schoolyard is that the ramp between the upper and lower part of the schoolyard  must have a downward gradient permissible for wheelchair users (max. 6 %).  For the determination of the necessary ramp length,  the elevation of the schoolyard was determined by the class VT99 in the year 2002 with loop levellings, which are attached to an elevation benchmark. 
Class VT99 (polar method from street) and class VT01 (off-setting form school yard) deterimined the location of the new building block and integrated it into the exististing digital map.
The complete engineering plan of the recordings of 2000 and 2002 looks like that ...
Translation: Stella Mansky and Tanja Graeger